The most serious problem on the site is increased humidity. An excellent way out of this situation may be an event to drain the surface of the earth.
The best method of drainage is digging drainage ditches. To create them, you need to observe some standard sizes adopted to drain the site. The width of the ditch should be from thirty to forty centimeters, and the depth from forty to sixty centimeters. Profile pipes are being sold now, they are usually forcoming to drain the site. They are usually bought by many.
It is necessary to dig such ditches around the perimeter of the entire site, and small stones, such as crushed stone or other construction waste (for example, broken bricks) should be filled on the bottom. Such drainage should have a layer of thirty centimeters. The remaining part of the ditch is covered with earth.
Another way to create drainage for sites is to lay pipes from asbestos cement, which have a diameter of about a hundred millimeters. To build drainage in this way in the pipes, grooves are sawn over the entire length or separate holes are made. But do not fall asleep the pipe only with earth, without crushed stone, because the holes can hide, and the water will have nowhere to drain.
The site can also be drained by mixed methods, for example, to plant several trees that absorb moisture, pour soil or create a special pond to collect excess water.